The development will consist/consist of: The conversion of existing attic to study/ store, with new dormer roof to rear façade & 2 No Roof lights to front facade, including all associated infrastructure and site development works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
35, Temple View Green, Clarehall, Dublin 13, D13 N9F2
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 5,150 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB1500/21
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Convert existing attic space to study / storage room with new dormer and window to rear and to alter existing gable roof profile, raising gable wall to mini Dutch hip roof profile with window.
Convert existing attic space to study / storage room with new dormer and window to gable elevation and roof light to rear
Proposed change of roof profile from hipped roof to full apex roof to allow room in attic for a playroom and storage.
Planning permission to demolish conservatory attached to rear of house and construct extension to kitchen attached to rear of house with pitched roof finish and construct new toilet attached to side of house with pitched roof finish both at ground floor level.
The development seeking permission will consist of the amending the existing roof to a gable roof, the construction of one dormer window in the main roof to the rear and the construction of two rooflights in the main roof to the front of the house.
Source match
Matched from public planning record WEB1500/21The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report