Applications tied to the site
Partial coverage12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 8,611 decisions within 5 km, 12 exact-site or onsite candidate records, and 942 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
942 structured nearby appeal records.
942 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The alterations to existing front boundary wall to widen the existing shared vehicular entrance, division of entrance and creation of new separate vehicular entrance onto Elm Mount Avenue.
The construction of a single storey porch extension to front, single storey extension to rear, alterations to existing roof profile (from hipped to gable end), with new porthole window in the north facing gable wall at attic level, dormer window in rear roof plane and alterations to existing front boundary wall to widen the existing shared vehicular entrance, division of entrance and creation of new separate vehicular entrance onto Elm Mount Avenue.
Planning permission sought for attic conversion with dormer window to rear and velux windows to front and rear, new gable end roof with new window to north side at attic level and all associated works at semi-detached house.
RETENTION & PERMISSION: Planning Permission for retention of a full day care crèche and after school minding service for 10 no. children, aged 2 years old to 7 years old at 47 Elm Mount Park, Beaumont, Dublin 7, D09 HK11. Opening hours 7.30 to 5.30, Monday to Friday. Crèche & after school service to comprise an internal area of 80.70 sq.m on the ground floor, including a rear garden, kitchen, play rooms, sleep room, changing area, remedial works to concrete side ramp (with awning & handrail) and all other associated facilities. Include also for Planning Permission for construction of front porch, removing a section (3.7m) existing front garden wall, for new vehicular access.
The creation of a new vehicular entrance onto Elm Mount Park in front boundary wall.
The development will consist conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
The brief summarizes the pattern across all 8,611 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB1555/21The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief