Applications tied to the site
Partial coverage20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 7,810 decisions within 5 km, 20 exact-site or onsite candidate records, and 934 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
934 structured nearby appeal records.
934 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development consists of the construction of a dormer window to the rear roof plane of the property to create additional attic space for storage and a playroom, The removal of existing hot water solar panels and replacement with modern solar panels to the side of the proposed dormer window. Also a new bathroom window in the rear wall to replace the existing roof light window. Plus all associated works.
The development will consist of the reorganisation of the first floor of the existing property and the additional of a bathroom window on the first floor of the front elevation.
The development consists of the: 1: demolition of existing single storey extension and 1st floor bathroom annex all to the rear of existing house 2: and for the construction of a part 2 storey extension to the rear & side of existing house. 3: and to convert the existing attic to include a dormer window to rear 4: and to widen existing vehicular access to the front existing on Vernon Grove 5: and for all associated site works.
The development consists of the conversion of the existing attic to include a dormer window to rear and for all associated site works.
The development will consist of • The construction of a dormer window structure to the rear roof slope at attic level, including associated roof alterations and chimney breast removal; and • changing of bay window roof from flat to pitched; and • The construction of a new extension to the rear of the property which will add to an existing ground floor extension, together with all associated site works and ancillary works necessary to facilitate the proposed development.
RETENTION: The development consists of the provision of a circular window in the side (east) gable wall at attic level.
The brief summarizes the pattern across all 7,810 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB1589/24The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief