Partial demolition of existing garage to side, partial demolition of existing single and two storey extension to rear, construction of new ground floor extension to side, construction of new ground and first floor extension to rear, installation of 3 no. new rooflights to existing rear main roof and all associated siteworks.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
13, Cherryfield Avenue Upper, Ranelagh, Dublin 6
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 13,928 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB1649/19
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Demolition of the existing two-storey rear return, construction of a new two storey extension to rear comprising ground floor kitchen extension with rooflights and new second storey bedroom and bathroom extension, new windows to front and rear and all associated landscaping and drainage works
Planning Permission is sought for a dormer attic conversion and realignment of main roof structure to replace hipped design with new gable design all to incorporate an ensuite bedroom with store and access staircase to house no. 1 The Orchard, Cherryfield Ave Upper, Ranelagh, Dublin 6, D06 C4A0. Also, proposed 2no. rooflights to be located on front elevation, proposed 1no. rooflight and 1no. window on the rear elevation and proposed 1 no. window to gable elevation. With connection to existing onsite services, and all associated site works.
Attic conversion for storage with a dormer window to the rear.
PERMISSION for extension to converted non habitable storage attic space with Dormer and single storey extension to Rear along with ancillary works.
Permission for development at a 0.054 Ha site at Milltown Park, Sandford Road, Dublin 6. The development will principally consist of the demolition of 83.7 sq m of the 'red brick link building' (single storey over basement) which forms part of the Jesuit Community Buildings and the construction of a new 2.4 metre high boundary wall across the site from east to west. The proposed works to the red brick link building include the following: - the demolition of a 3 no. bay section of facade and a section of roof; - the removal of a section of the internal floor area and provision of new internal stairs; - the removal of the existing 'means of escape' external stairs from the roof; - the construction of a new gable wall and parapet over roof to match existing, - a new external 'means of escape' stairs from roof level and a new security fence to the 'means of escape' stairs. The development will also consist of hard and soft landscaping and all other associated site works (internally and externally) above and below ground
The full report covers all 13,928 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record WEB1649/19The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report