Applications tied to the site
Partial coverage21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 7,874 decisions within 5 km, 21 exact-site or onsite candidate records, and 939 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
939 structured nearby appeal records.
939 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning Permission sought for the partial demolition of an existing rear extension and construction of a new extension to the rear of the property, with internal and external alterations to the ground and first floor of the existing two-story property, with associated site drainage, hard and soft landscaping and ancillary works.
Permission sought to build new two storey, detached three bedroom house and all associated site works at Hazel Lane, Clontarf, Dublin 3. (Rear of 73 Kincora Road, Clontarf, Dublin 3.
RETENTION: Retention permission for dormer window to the side of the house and widening of the vehicular entrance, and all associated siteworks.
The development consists of: (a) Alterations and extension to existing attic room to include new access stairs, shower room, dormers at side (east elevation) and at rear (north elevation) and Velux roof-light at front (south elevation). (b) first floor extension at side containing 1 No. Bedroom and home office / study. (c) New Tiled Pitched roof to existing single storey area of house at front (south elevation) which will include a canopy to front entrance door (d) All associated site works and services.
The development will consist of the removal of the front boundary fence and the construction of a new detached two-storey six bedroom house, new front boundary wall set back from Hazel Lane, with new vehicular access, 2 no. parking spaces, SUDS drainage, associated site drainage, hard and soft landscaping and ancillary works.
The development will consist of the construction a new detached part 2-storey /part 1-storey four bedroom house with a side facing 1st floor roof terrace, new front boundary wall to provide access from Hazel Lane with new vehicular access, 2 no. parking spaces, SUDS drainage, associated site drainage, hard and soft landscaping and ancillary works.
The brief summarizes the pattern across all 7,874 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB1686/24The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief