Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 5,464 decisions within 5 km, 4 exact-site or onsite candidate records, and 644 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
644 structured nearby appeal records.
644 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning Permission for a development comprising: demolition of existing out buildings and construction of a part single, part two storey extension to the rear of dwelling, together with skylights, boundary treatments and associated siteworks
Planning permission for development comprising: Demolition of front single storey entrance porches and construction of two storey extension to the front together with associated site works.
Demolition of 2no. garden storage sheds, the construction of a new 61sq.m two-storey extension to the rear and side of the existing house, the refurbishment and thermal upgrade of the existing house, alterations to an existing front porch, the reconstruction and 12 sq.m extension of an existing 16.4 sq.m work from home studio to the rear of the property and all associated site works for this development.
Planning permission for the construction of a single storey extension to front of property in line with existing porch.
The development will consist of a new single-storey Sports Club building to include Members Room, Kitchen, Gymnasium, Sports Hall, Toilets and Showers, Reception and Office, Lobby and Corridors, Storage, Mechanical Plant Room and a screened Outdoor Service Yard and includes all associated site works. The Sports Club is to be accessed by new vehicular and pedestrian entrances off All Saints Park to include 3 no. car parking spaces, 5 no. outdoor bicycle stands and a Covered Bike Shed to the rear with 10 no. spaces with secondary pedestrian and cycle access from the public walkway abutting the Eastern boundary and Scoil Aine. The site perimeter is to be railed with a 1.2m high bow-topped railing and the development requires the removal of a total of 12 no. existing Lime trees adjacent the Western boundary to All Saints Park.
Permission for the construction of a single storey rear extension to existing two storey semi-detached house and all associated site works.
The brief summarizes the pattern across all 5,464 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB1750/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief