The development seeking permission will consist of the provision of a 3m wide vehicular entrance to the front of the property.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
56, Neagh Road, Dublin 6w
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 12,845 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB1750/25
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
RETENTION: The retention of a front porch, rear single storey ground floor extension, rear first floor extension, roof light and stove flue on the rear roof slope and garden structure.
Planning permission for construction of a single storey porch extension to front as well as a two storey living room and bedroom extension to rear with internal alterations to house and all associated site and drainage works.
Permission for works consisting of alterations to the existing pedestrian gateway to be widened to create a new vehicular access 3.5m wide, all associated alterations, siteworks and ancillary works.
Permission for a vehicular driveway entrance and pavement dish with associated site works.
Permission to include a new glazed box window & flat roof porch extension to front, single storey extension to side & 2 storey pitched roof extension to rear with associated site works.
The full report covers all 12,845 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record WEB1750/25The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report