Installing a new window opening at first floor level to front elevation.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
78, Dingle Road, Cabra, Dublin 7
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 9,510 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB1996/20
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Single-storey porch to front and vehicular access driveway, walls, piers, gates and ancillary site works to front
Planning permission for a. Removal of existing substandard extension to side and replacement with a less obtrusive modern two storey extension. b. Attic conversion incorporating dormer extension to rear, c. All associated site works.
Permission for: a. change of roof profile from hip end to full gable end profile to accommodate attic conversion with dormer extension to rear, b. removal of tiled roof to existing two, storey extension to side and replacement with flat roof to same, c. all associated site work.
The development will consist of a dormer to the rear roof of the of the existing dwelling. The proposed dormer will be compliant with the current development plan standards in terms of size and materials proposed, not exceeding the ridgeline of the house, with its sides being appropriately located away from the adjacent properties and leaving a significent portion of of the existing roof visible.
A new part 2 storey, part single storey extension to Rear of dwelling, Conversion of attic space to office area with dormer type window to rear with internal modifications, and associated site works.
Source match
Matched from public planning record WEB1996/20The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report