Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable, new access stairs, 3no. roof windows to the front and flat roof dormer to the rear.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
14 Celtic Park Road, Beaumont, Dublin 9, D09 C995
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 9,000 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB2182/25
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
RETENTION: Retention Permission is sought for existing vehicular entrance and driveway.
RETENTION: Retention of as built shed double doorway to side façade and retain 2no. wider rear façade windows (frosted) to side two storey extension with associated internal and external alterations to dwelling house as altered from previous granted application no. Web1238/18.
Planning permission for the demolition of existing ground floor extension, construction of a new ground floor extension to rear of existing house and widening of entrance gates at front at No. 13 Celtic Park Road, Beaumont, Dublin 9.
Permission for attic conversion to storage room with flat roof dormer and windows to rear also internal alterations to layout at ground floor and all associated site works.
The development will consist of flat roofed dormer to the rear.
The full report covers all 9,000 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record WEB2182/25The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report