Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

138, Keeper Road, Drimnagh, Dublin 12

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 12,028 nearby planning records within 5 km where a location match is available.

Matched source
WEB2220/25
Project type
One-off house
Coverage
5 km radius
12,028Nearby applications
13%Refused
10,464Conditional grants
5Refusal reasons

Top refusal reasons nearby

Design2
Procedure Invalid1
Residential Amenity1
Visual Amenity1

Nearest similar decisions

WEB2220/25

The development will consist of a single-storey lean-to roof extension to the front of the existing two-storey semi-detached house, along with a new vehicular entrance off Keeper Road.

Granted0.0 km24 July 2025
4374/23

PERMISSION:The proposed development consists of demolition of the former Fr. Lar Redmond Community Centre (one-storey, circa 160 sq.m.) and the construction of an older persons age-in- place' development consisting of a four, five and six-storey community facility / apartment building in its place. The accommodation proposed consists of: 20no. one-bedroom (two-person) units and a community room at (upper) ground floor level, as well as off-Street under-croft car parking (3no. spaces), 8no. bicycle spaces, plus residents' lock-ups, refuse storage and services infrastructure. The development is laid out in a horse-shoe arrangement around an open-air lightwell/ courtyard, with an external roof terrace for the amenity of residents at fourth floor level. The proposed development includes all associated site works, landscaping, boundary treatments and services installations, as well as upgrading the footpath bounding the site to the east in accordance with DCC standards, with the provision of a vehicle set-down area on this side street. The proposed car park access point is off the rear laneway, with entry to the apartment lift and stair core provided from both the parking area and the footpath running along the eastern elevation. Access to the (upper) ground floor community room is provided directly off Keeper Road and from the rear parking area. The apartment units, from the first to fifth floors, are designed to be fully compliant with D.C.C. and DHPLG standards, including three which meet with the Irish Wheelchair Association Best Practice Housing Guidelines. The majority are dual aspect and have balcony terraces along the northern, eastern, and southern elevations. The total floor area of the proposed development is 1,569 sq.m.

Granted0.1 km20 August 2024
2463/21

Permission for development at this site located at 47 47b 49 51 & 53 Keeper Road, Drimnagh, Dublin 12 (and extending to the laneway at the rear of said properties). The development will consist of the following: Demolition of existing commercial units and ancillary buildings (1-2 storey) (c.1,675 sq.m in total) and the construction of a 5 to 6 storey, mixed use development including 53 no. apartments (26 no. 1-beds and 27 no. 2- beds). All units provided with private balconies facing north/south/east/west. Provision of a creche (with courtyard play area) (c.175 sq.m), retail unit (c.90 sq.m). 15 no. car parking spaces (undercroft to be accessed from laneway to the east off the site), cycle parking spaces, landscaped open spaces/roof gardens, bin storage, ESB substation, plant rooms, and ancillary areas. All associated site development, landscaping, boundary treatment works and services provision.

Granted0.1 km08 November 2021
3372/23

Development at this site (3.3746ha) currently occupied by Crumlin Shopping Centre located to the north of Crumlin Road, Crumlin, Dublin 12. The site is bounded by existing residential dwellings to the north and east, Crumlin Road to the south and existing residential dwellings and Brickfield Drive to the west. The development will consist of the overall demolition of existing buildings and structures on site (11,444 sq.m) and the construction of a Shopping Centre with an overall height of 12.9m and an overall gross floor area of 16,892.8 sq.m (of which the shopping centre building is 16,678.4 sq.m, with the remaining 214.4 sq.m forming detached ancillary accommodation outside the footprint of the main shopping centre building), comprising the following: -Provision of a new anchor retail unit at ground floor and part first floor (10,245.8sq.m) comprising 8,983.1 sq.m retail floorspace (grocery and textile) including off-licence, 2no retail concession stalls (112.7 total sq.m) and ancillary café area (135.6 sq.m) associated with the anchor retail unit and an online grocery pick up room located to the rear of the proposed development (224.4 sq.m). The anchor retail unit will be served by all associated ancillary accommodation located at ground and first floor levels (1,262.7 sq.m) including storage areas comprising freezer rooms, fresh produce room, dairy room and cold meat room, loading areas, switch rooms, ESB meter rooms, water storage room and staff facilities including toilet, shower and changing facilities, kitchen, lockers and associated offices and break out rooms; -Provision of a 'Food Market' (1,149.7 sq.m) with 7 no. kitchens on ground floor level located within the proposed shopping centre with associated 'food court' including food counter and seating area located off main mall area (265.9 sq.m) for consumption of hot food on and off premises including and off premises including ancillary take away function and associated ancillary accommodation including offices, store rooms, chill and freezer rooms, water storage room, F.M calorifyer room, ESB rooms, switch rooms and staff toilet and changing facilities. In addition, dedicated and enclosed courier parking to serve the Food Market is located to the rear of the proposed shopping centre; -Provision of a cafe unit (413.2 sq.m) with kitchen serving area and stores with independent access via Crumlin Road on southern elevation and 4 no. independent retail units (ranging from 107.3 sq.m to 182.4 sq.m each, totalling 545.2 sq.m) with associated staff areas located on the ground floor adjacent to the entrance on western elevation with access via main internal mall area; -Provision of a library facility with flexible exhibition/community/ arts and cultural multi-function space (1,046.7 sq.m) located on the ground and first floor of the proposed development with independent access located on ground floor level at the south- eastern corner fronting on to Crumlin Road. The library will also include all associated ancillary accommodation including lobbies, stores, a water storage facility, toilet and changing facilities and a staff room; -and Provision of a gym facility (1,620.7 sq.m) located on the ground and first floor of the proposed development with independent access located on ground floor level on the western elevation. The gym facility will also include all associated ancillary accommodation including lobbies, store rooms, a water storage facility, offices, shower, toilet and changing facilities. The proposed shopping centre will be served by a public toilet block (215.5 sq.m) with associated accommodation including cleaning, parent and sensory rooms, wheelchair accessible toilet and changing facilities, a reverse vending machine, mall and circulation floor space including service corridors, associated stair / lift cores and fire exit corridors, a CCTV and security room, a gas meter room, and a loading bay to the rear with associated pallét areas (to be served via existing service entrance adjacent to south- eastern boundary of site on Crumlin Road), totalling 1,657.1 The proposed development includes a sprinkler tank, pump room, ESB substations, switch rooms, a generator and transformer and a recycling bottle bank all located to the rear of the proposed development, totalling 214.4 sq.m. The proposed development also includes the provision of a mobility hub located adjacent to the western entrance to the development on the southern boundary which will provide safe and secure bicycle parking, a taxi rank, an interactive map, a USB charging facility, a pump, parcel lockers and scooter parking. In addition, the proposed development includes the retention of 400 no.existing car parking spaces on site (loss of 103 no. existing car parking spaces) which will be upgraded with the provision of 80 no. EV Charging car parking spaces, family car parking spaces, 'click-and-collect' car parking spaces and online delivery infrastructure, wheelchair accessible car parking spaces and car share scheme car parking spaces. The proposals also include 20 no. motorcycle parking spaces and 267 no. bicycle parking spaces including 6 no. cargo bicycle parking spaces. The bicycle parking spaces will be accommodated in dedicated bicycle parking stores (44.5 sq.m + 35.18 sq.m) located to the rear and adjacent to the northern boundary respectively, and through the provision of external bicycle stands. The development will be served by the existing vehicular and pedestrian access off Crumlin Road with proposed upgrades including a raised table at entrance. A separate access for deliveries and services is also proposed which will be located on the south-eastern corner of the site on to Crumlin Road with proposed upgrades including a raised table and service yard gate. The development will also involve the provision of urban realm upgrades and improvements including hard and soft landscaping to the south of the proposed building along the Crumlin Road, provision of associated signage on western and southern façades including a 6m high totem pole located adjacent to the main vehicular entrance on Crumlin Road and a 3m high totem pole located adjacent to the entrance on the western façade, boundary treatments, public lighting, solar panels on roof, green roofs / SUDs treatments, retention of existing taxi rank on Crumlin Road and provision of foul, surface water and water services on site with connections and modifications to existing. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.

Granted0.2 km09 April 2024
WEB1748/22

Removal of existing single storey rear extension and replace with new 2 storey rear extension and all associated site works

Granted0.2 km07 October 2022
4404/24

PERMISSION for a new dormer window to the rear (east) elevation at No 26 Brickfield Drive, Crumlin, Dublin 12

Granted0.2 km20 January 2025

The full report covers all 12,028 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required