Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
31 Mount Prospect Avenue, Clontarf, Dublin 3, D03 EV20Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

31 Mount Prospect Avenue, Clontarf, Dublin 3, D03 EV20

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

9% of nearby decided applications were refused. The site check found 7,551 decisions within 5 km, 18 exact-site or onsite candidate records, and 881 structured appeals.

Matched source
WEB2420/25
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

18 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

881 structured nearby appeal records.

881 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.

1 matched
7,551Nearby applications
18Site-linked candidates
9%Nearby refused
881Structured appeals

Top refusal reasons nearby

Residential Amenity6
Zoning Contravention6
Visual Amenity3
Design2
Other1

Nearest planning decisions

WEB2420/25

The development will consist of the demolition of an existing rear single storey extension and garage and the erection of a new part two storey and part single storey flat roofed rear extension. Associated ground floor and first floor internal alterations. Erection of a new single storey flat roofed garage to the side. Erection of a pitched roof dormer to the side and a flat roof dormer to the rear of the house and conversion of the existing attic space. Alterations to existing openings to side elevation. Widening of existing vehicular entrance. All associated landscaping, new boundary treatments, drainage, ancillary site works and services.

Granted0.0 km11 August 2025
WEB2314/24

The development will comprise of the demolition of the existing side extension and rear conservatory (58 sqm), internal alterations to the existing dwelling, construction of new part two-storey, part single storey extension to the side and rear of property (113 sqm), installation of PV panels on roof, and construction of new entrance canopy to front of property. Permission is also sought for construction of new entrance piers; boundary treatments; bin store and all site development works including drainage connections and landscaping.

Granted0.1 km26 September 2025
WEB1500/20

Application for the construction of a part single-storey / part two-storey extension to the side and rear of an existing dwelling, the addition of a rooflight to the existing roof, for minor alterations to the front elevation and for all associated site works.

Granted0.1 km15 April 2021
WEB2783/25

The development will comprise of: (i) conversion of the existing garage to habitable accommodation; (ii) construction of a part-single, part-two-storey flat-roofed extension to the rear and side of the existing dwelling; (iii) extension at first floor level to the side of the existing dwelling with extended pitched roof and roof lights; (iv) construction of a dormer structure at attic level to the rear of the dwelling; and all ancillary works, roof lights, associated landscaping, boundary treatments and ground works necessary to facilitate the development.

Granted0.1 km23 September 2025
4572/23

The proposed development will consist of The development will consist of: (i) the removal of existing single storey pitched roof rear extension; (ii) construction of new two storey flat roof rear extension; (iii) attic conversion to include a dormer window to the rear and a dormer window to the side of main roof; (iv) removal and replacement of front boundary wall and gates; (v) elevations to include 1 no. rooflight at attic level to front, 2 no. rooflights at attic level to rear; (vi) replacement of the front garden shed within same foot print as last of 1.65m in height; (vii) minor alterations to landscaping and all associated works to facilitate the development.

Granted0.1 km24 November 2023
3513/23

RETENTION: The development consists of: (i) Retention of garden shed (c. 7sq.m in area), located within the front garden of the property, adjoining the sites western boundary; (ii) Retention of timber fencing, with a height of approximately 1.780m, along the sites eastern and western boundaries, to the front of the property; and (iii) all associated works necessary to facilitate the development.

Granted0.1 km30 May 2023

The brief summarizes the pattern across all 7,551 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required