Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 12,189 decisions within 5 km, 10 exact-site or onsite candidate records, and 1647 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1647 structured nearby appeal records.
1,647 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Single-storey front extension with pitched roof. New pitched roof over existing side extension. Side window on extension to be changed to a door. New vehicular access with dropped kerb.
Planning permission for the development will consists of: (1) the construction of a single storey extension with flat roof to the front and side of the existing house; (2) replacement of existing railings and gates to the front of property with new wall and gates; (3) all associated site development works.
RETENTION: The development consists of a change of use from workshop to a GYM with reception area, the erection of new signage to the front of building and all other ancillary site development works
CHANGE OF USE from a Gym to a Place of Worship.
Planning Permission for alterations to the front elevation to include removal of stone effect finish and repointing of original brick facade, demolition of the existing two-storey rear return, the construction of a new part single-storey, part two-storey extension to the rear with flat roofs and roof lights, inner courtyard, rear canopy with rainwater butt, internal layout modifications, three new roof lights to the front, alterations to the existing roofs, wider vehicular entrance, step and ramp at the entrance door, new paving, landscaping, new connections to the public sewers and all associated site and other works.
PERMISSION/RETENTION. Permission for 1. Conversion of existing attic space to habitation. Existing double apex roof to be replaced with a single apex roof with a dormer-style window to the rear and three No. Velux style roof lights, to the front of the dwelling. Parapet to the front of dwelling to remain in place at the existing height 2. Retention permission for pigeon loft with flat roof & Home office with pitched roof both in the rear garden at No. 104 Church Rd, East Wall, Dublin 3, D03 E890.
The brief summarizes the pattern across all 12,189 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB2474/24The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief