RETENTION AND PERMISSION: We Parkwall Taverns intend to apply for Retention and Planning permission for development at the site: Hole in the Wall pub, Blackhorse avenue, Dublin 7, D07 V663. The development consists of: Proposed retention permission of the existing modified shipping container, previously approved reg.ref. 2069/19, which facilitates 'to go' coffee and snacks during the working hours of 7.30am to 8pm Monday - Sunday; and Permission for proposed associated planter boxes, screening, hardscaping, landscaping and all associated site servicing and development works.
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Hole In The Wall Pub, Blackhorse Avenue, Dublin 7
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 7,595 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB2499/25
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest planning decisions
Alterations to reconfigure the existing seating area north of Dash Café to provide for (i) alterations to the existing seating layout and replacement of 11 no. existing picnic benches with 9 no. new modern picnic benches laid atop a proposed gravelled area, (ii) 7 no. spray finished timber planter boxes (to include 4 no. tree boxes, 2 no. shrub/plant planter boxes, and 1 no. raised timber planter boxes, and 1 no. raised timber planter with a bar style ledge) with powder-coated timber fencing to the inside and landscaping in-between, (iii) new granite paving for existing pedestrian access, (iv) a stone border around seating area to be flush with concrete path and gravel, (v) a new concrete footpath north of the seating area providing for 25 no. bollards, (vi) 8 no. new bicycle parking spaces, (vii) and all ancillary works and landscaping necessary to facilitate the proposed development.
The development will consist of proposed revision of the current opening times of the dash container from 07:30am – 20:00pm as per previously approved Reg. Ref. 2069/19 to the proposed times of 06:30am – 21:00pm.
The development consists of a modified shipping container, 6m x 2.5m, alongside existing seating area, to be used as a facility for serving to go coffee and snacks during the hours of 7.30am to 8pm Monday to Sunday.
The development will consist of proposed provision of two 3x4 meter parasols to cater for existing external seating area with 8 metres of branded external screens to the road side of site and all associated site works.
The development will consist of: Change of use of the existing residential area at first floor, to a proposed commercial use, including the provision of a new stairwell inside the existing entrance to the public house. First floor to accommodate 2 no. Meeting rooms; 1 no. Office and associated works.
The brief summarizes the pattern across all 7,595 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record WEB2499/25The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief