Applications tied to the site
Partial coverage20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 14,319 decisions within 5 km, 20 exact-site or onsite candidate records, and 3045 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3045 structured nearby appeal records.
3,045 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
A two-storey extension to the rear of the existing mid-terrace house at ground and first floor levels; alterations to the facade of the existing house including relocation of the front door and resizing of the existing front windows; provision of 5 no. new roof lights; internal alterations and all associated site works.
The development will consist of a new EV charging point mounted to the front wall of the existing house, enlargement of the existing front bedroom window, raising the height of the roof and parapet of the existing rear extension by 200mm, a new rear extension with flat roof and rooflight at 1st floor level, two new rooflights to the existing front roof slope, internal alterations and ancillary site works.
The development will consist of a new EV charging point mounted to the front wall of the existing house, enlargement of the existing front bedroom window, raising the height of the roof and parapet of the existing rear extension by 200mm, a new rear extension with flat roof and rooflight at 1st floor level, two new rooflights to the existing front roof slope, internal alterations and ancillary site works.
The development will consist of a new dormer window to the rear roof slope and associated internal alterations.
PROTECTED STRUCTURE: The development consists of: Change of use of existing offices to social care residential accommodation with internal alterations (kitchen, bathrooms & fire lobbies) and upgrade works at 62 Rathmines Road Lower, Dublin 6. The subject property is a Protected Structure.
PROTECTED STRUCTURE: Planning permission for keeping the pedestrian gate and surrounding ironwork in place, and removing the entire front railing, granite capping and brickwork and store safely under cover and form a vehicular access and off-street parking to front with gates to match existing railings to provide one disabled car parking space.
The brief summarizes the pattern across all 14,319 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB2679/24The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief