Conversion of her attic to storage including changing her existing hipped end roof to a gable end roof, a dormer window to the rear and 2 Velux rooflights to the front all at roof level.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
31, Furry Park Road, Dublin 5
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 7,617 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB2776/25
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Permission for extension and alterations to existing dwelling, to include - At ground floor: extend rear kitchen/living area with 2 rooflights. At first floor: extend rear master bedroom with ensuite. With connection to existing services, and all associated site works.
Permission sought for new driveway and vehicular entrance and associated site works.
The construction of 1) a part 2 storey part single storey extension to the rear 2) an attic conversion with a dormer to the rear 3) a velux roof window to the front at attic level 4) conversion of the existing rear garage into an ancillary family garden room with new pitched roof incorporating attic storage, with all associated site works and SUDs drainage.
To widen the pedestrian entrance to create a vehicular access 3m wide with associated kerb dishing to facilitate off street parking and EV charging.
The proposed development will consist of the construction of an attic conversion with rear dormer with flat roof and side dormer with hipped roof.
Source match
Matched from public planning record WEB2776/25The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report