Installation of RTO Equipment 15m (L) x 5.5m (W) x 11m (H), to the north side of the B1 Building, including a ground level pipe rack and associated works at Clonshaugh Business and Technology Park, Dublin 17, D17 E400. The site activity is subject of an Industrial Emissions Licence No. P0306-03.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Building B1, AbbVie, Clonshaugh Business & Technology Park, Clonshaugh, Dublin 17, D17 E400
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 6,153 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB5067/21
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
PERMISSION:The development will consist of the installation of 1,009.3 sqm roof-mounted solar photovoltaic panels to include all ancillary works and services.
Works to include modification & extension of approx. 8sqm to single storey main entrance lobby and relocation of existing façade mounted company signage.
Planning permission for development on a site of c. 0.025 hectares at Clonshaugh Business and Technology Park, Dublin 17. The site is located to the south of an existing data storage facility at the former Cahill Printers building (Building B). The proposed development comprises of a container compound for the purposes of providing ancillary modular plant, electronic equipment and machinery space. The development comprises 4 no. prefabricated metal containers (stacked to form 2 no. storeys), associated access arrangements and staircases, a boundary fence enclosure around the proposed development with 3no. access points, and all ancillary works.
Planning permission for the construction of a stand alone sprinkler tank and pump house and all associated site works.
The development will consist of: (i) removal of existing vehicular entrance/access roadway and provision of 2no. new vehicular entrance gates and 1 no. pedestrian entrance gate off the Clonshaugh Business and Technology Park campus roadway; (ii) construction of 1 no. single-storey warehouse, with ancillary office accommodation, building (3,955sq.m) with solar/pv panels at roof level; (iii) provision of 2 no. parking bays comprising a total of 20 no. car parking spaces (inclusive of 5 no. accessible spaces) and 3 no. bicycle racks comprising a total of 24 no. bicycle parking spaces; and, (iv) all associated site development works, including landscaping, boundary treatment and, SuDS drainage works, necessary to facilitate the development.
The full report covers all 6,153 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record WEB5067/21The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report