Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 11,612 decisions within 5 km, 9 exact-site or onsite candidate records, and 1483 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1483 structured nearby appeal records.
1,483 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
A double storey pitched roof extension and a single storey flat roof extension, all to rear, comprising a kitchen/dining room, WC and utility room at ground floor. The refurbishment will also include the relocation/enlargement of existing bedrooms, new wet room and ensuite at first floor with all related works
A double storey pitched roof extension and a single storey flat roof extension, all to rear, comprising a kitchen/dining room, WC and utility room at ground floor. The refurbishment will also include the relocation/enlargement of existing bedrooms, new wet room and ensuite at first floor with all related works
The development consists of: Demolition of existing rear extension containing a bathroom and shed abutting 32 Connaught Street, Phibsborough. A single storey flat roof extension, all to rear abutting 32 Connaught Street, Phibsborough, comprising kitchen/ dining room, WC and en-suite at ground floor. The refurbishment of existing room into a bedroom at ground floor.
The development will consist of: partial demolition of existing single storey return, new single storey rear extension, new rear roof lights, external shading frame, SuDS drainage, minor internal first floor reconfiguration, landscaping works and all associated ancillary works to facilitate the development.
To convert the existing attic space to home office/study with the construction of a dormer window in the rear elevation roof plane and addition of two roof lights in the front elevation roof plane.
Development to include alterations and construction of combined flat roof dormer accommodations incorporating the shared party wall in the rear slope of the existing roofs of the 2 two storey terraced houses at 42 and 44 Connaught Street Phibsborough, Dublin 2 (Eircodes D07HD29 and D07FK15 respectively)
The brief summarizes the pattern across all 11,612 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB5162/21The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief