PERMISSION & RETENTION. The Board of St James’s Hospital intends to apply for planning permission and retention permission for development at this site, St James’s Healthcare Campus, St James’s Street, Dublin 8. The development for which planning permission is sought will consist of a 55 sq. m. single storey extension to the Burns Unit to accommodate a dayroom and staff office. The development for which retention permission is sought consists of an 81.8 sq. m. elevated plant room erected to the west of the Burns Unit and a service bridge extension to the Burns Unit.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
St James's Healthcare Campus, St James's Street, Dublin 8
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 12,202 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB5451/25
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The development will consist of: Planning permission for the sub-division of existing site for the construction of a two-storey semi-detached house with single storey element to side and all associated site works.
Planning permission for forming a new pedestrian gate in block boundary wall to rear of property on to rear public roadway.
The Board of St. James's Hospital intends to apply for planning permission for development in the courtyard to the north of the Bone Marrow Treatment Unit, Phase 1F, St. James's Hospital, James's Street, Dublin 8, D08 A978. The development will consist of the construction of a single storey 4.9m high extension (212 sq. m.) to the Bone Marrow Treatment Unit to accommodate 4 no. acute leukaemia hospital ward treatment units; a link corridor to the existing Bone Marrow Treatment Unit (a further 18 sq. m.); roof top plant equipment with 1.4m high screen; and all other site development works above and below ground required to facilitate the development, all at podium level within the adjacent courtyard.
The proposed development will consist of the demolition and removal of existing single-storey extension to the rear of the existing two-storey terraced house and replacement with a new single-storey extension, including remodelling of existing ground and first floor accommodation, including all associated site works.
The development will consist of replacement/demolition of a temporary storage unit of 4.15m2 and the erection of a single storey building of 221m2, 41.15 metre high, to accommodate Clinical Supply Facilities, a patient reception area including linked access to the existing hospital corridors, plant equipment and all other site development works, above and below ground required to facilitate the development, all at podium level within Courtyard 12, Phase 1C of the Main Hospital Block. This proposed development is to facilitate the reconfiguration of the Cardiac Catheterisation Laboratory and associated departments.
Source match
Matched from public planning record WEB5451/25The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report