Planning permission for attic conversion with dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to front, Gable window to side all with associated ancillary works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
19 Spire View, Dublin 7, D07 Y5A0
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 8,002 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB5918/25
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning permission is sought for attic conversion for study / storage use, raising of gable end to change roof profile with dormer projecting window to rear and all associated site works.
The development consists of an attic conversion with alterations to the existing tiled roof, a new dormer roof extension with windows to the rear, internal alterations to layout, new internal stairs, roof lights to the front & side of the existing roof and all associated site works.
PERMISSION is sought for the introduction of a New Access gateway into the Existing Boundary Wall to Abbey Drive, to serve as Student Access to the new pathway and Existing Avenue adjacent to the all-weather GAA pitch together with all ancillary work including resurfacing and pathway lighting. The proposed gateway to be open only between the hours of 7am and 7pm daily at St Dominic’s College, Ratoath Road, Dublin 7, D07 NX47 by the Board of Management of St. Dominic’s College, Cabra, Dublin 7.
Retention and Completion of a New Ball Catch system to include 10 no. 15m high netting poles to previously granted GAA Pitch reference 3528/23.
Permission is sought for the upgrading of 1 no. existing GAA playing pitch to a new synthetic playing surface, the erection of 6 no. 18 meter high lighting poles to illuminate the GAA pitch and, ancillary works including drainage and fencing.
The full report covers all 8,002 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record WEB5918/25The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report