Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Former Aldi Site, Carmanhall Road, Sandyford Business District, Dublin 18, D18 V228

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 9,001 nearby planning records within 5 km where a location match is available.

Matched source
ABP30594019
Project type
One-off house
Coverage
5 km radius
9,001Nearby applications
11%Refused
7,994Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

ABP30594019

Permission for a strategic housing development, which will have a Gross Floor Area of 49,342 sqm m will principally consist of: the demolition of the existing structures on site and the provision of a Build-to-Rent residential development comprising 564 No. apartments (46 No. studio apartments, 205 No. one bed apartments, 295 No. two bed apartments and 18 No. three bed apartments) in 6 No. blocks as follows: Block A (144 No. apartments) is part 10 to part 11 No. storeys over basement; Block B (68 No. apartments) is 8 No. storeys over basement; Block C (33 No. apartments) is 5 No. storeys over lower ground; Block D (103 No. apartments) is part 16 to part 17 No. storeys over lower ground; Block E (48 No. apartments) is 10 No. storeys over semi-basement; and Block F (168 No. apartments) is 14 No. storeys over semi basement. The development provides resident amenity spaces (1,095 sqm) in Blocks A, C and D including concierge, gymnasium, lounges, games room and a panoramic function room at Roof Level of Block D; a creche (354 sqm); café (141 sqm); a pedestrian thoroughfare from Carmanhall Road to Blackthorn Drive also connecting into the boulevard at Rockbrook to the west; principal vehicular access off Carmanhall Road with servicing and bicycle access also provided off Blackthorn Drive; 285 No. car parking spaces (254 No. at basement level and 31 No. at ground level); 21 No. motorcycle spaces; set-down areas; bicycle parking; bin storage; boundary treatments; hard and soft landscaping; lighting; plant; ESB substations and switchrooms; sedum roofs; and all other associated site works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire - Rathdown County Development Plan 2016-2022.The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application together with an Environmental Impact Assessment Report may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire - Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.sandyfordcentralshd.ie.

Granted0.0 km12 March 2020
ABP30142818

Notice of Strategic Housing Development Application to An Bord Pleanála for

Granted0.0 km17 July 2018
D24A/0345/WEB

Permission for the erection of new signage at Sandyford Central Café, Sandyford Central, Sandyford, Co. Dublin, D18WN5V

Granted0.1 km05 July 2024
D18A/1210

Permission for development. This is a new primary school opening in

Granted0.1 km23 May 2019
D25A/0788/WEB

1) the demolition of an existing two-storey warehouse/office building on the site (approximately 1,016 sq. m. GFA); 2) the construction of an up to nine storey aparthotel (approximately 7,424 sq. m. GFA) consisting of 122 no. suites (73 no. one bedroom and 49 no. two bedroom) with reception area, administration and back of house facilities, ancillary public areas service, plant areas, waste management areas and storage areas at ground floor, provision of 16 no. surface car parking spaces (including 2 no. disabled spaces) and 54 no. cycle parking spaces; and 3) all other site development works required to facilitate the development including the formation of an additional vehicle access onto Ballymoss Road and set down area in front of the building, ESB substation and switchroom, installation of PV panels on the roof, hard and soft landscaping, landscaped roof terraces on fifth and eighth floor level and public realm upgrades to Ballymoss Road including additional tree planting and crossings over the existing footpath.

Granted0.1 km17 April 2026
D21A/0295

Permission for development. The development will consist of: 1) the demolition of an existing two-storey warehouse/office building on the site (approximately 1,016 sq.m. GFA); 2) the construction of an up to nine storey aparthotel (approximately 7,424 sq. m GFA) consisting of 124 no. suites (75 no. one bedroom and 49 no. two bedroom) with associated ancillary support facilities at ground floor including café (83 sq. m. GFA), gymnasium (25 sq. m. GFA), multi-purpose room (26 sq. m. GFA), administration and back of house facilities over a single level basement providing 37 no. car parking spaces (including 2 no. disabled spaces), 36 no. cycle parking spaces, service and plant areas, waste management areas and storage areas; and 3) all other site development works required to facilitate the development including the formation of an additional vehicle access onto Ballymoss Road and set down area in front of the building. ESB substation and switch room, 14 no. surface cycle parking spaces, installation of PV panels on the roof, hard and soft landscaping, landscaped roof terraces on fifth and eighth floor level and public realm upgrades to Ballymoss Road including additional tree planting and crossings over the existing footpath.

Refused0.1 km02 June 2021

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required