Permission for development on a 1.37 hectare site. The development will consist of: 1) the demolition of the existing office/warehouse building on the site (approximately 3,150 sq.m. (gross)); 2) the construction of a 27,751 sq.m. (gross) development over a single level basement comprising 4 no. six storey buildings: Block A - 6,185 sq.m. (gross) offices; Block B - 6,185 sq.m. (gross) offices; Block C - 6,185 sq.m. (gross) offices; Block D - 9,170 sq.m. (gross) (9,004 sq.m. offices and a 166 sq.m. cafe at ground floor); a 11,048 sq.m. a single level basement providing 277 no. car parking spaces, 168 no. bicycle parking spaces, staff changing/shower/toilet areas, service and plant areas, waste management areas and storage areas; 3) the construction of a vehicular access to the site on Arena Road; 4) the provision of a public plaza incorporating soft and hard landscaping and water features and 80 no. cycle parking spaces; 5) and all other associated site works required to facilitate the proposed development including a 26sq.m. electricity substation and switch room building.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site at Burton Hall Road, Sandyford Business Estate, Dublin 18, the site is bounded to the north by Burton Hall Road; to the west by Blackthorn Road; and to the east by Arena Road
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 8,702 nearby planning records within 5 km where a location match is available.
- Matched source
- D16A/0076/E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
5 year temporary permission for 1: installation of single storey lightweight aluminium frame building (total area 800sqm) for use as an electric vehicle preparation centre. To include dry valeting, Electric vehicle charging, handover bays, ancillary office and staff facilities. 2 Non illuminated building signage. 3 Installation of a seperate single storey lightweight aluminium frame building (total area 105sqm) for use as a wet valeting facility. 4 Rainwaterharvesting tanks (total capacity 36000 litres) and below ground silt and petrol interceptor and attenuation 5. 12 no. electric vehicle exterior charging points. 6 all associated site works.
Permission for an extension. The development will consist of a) refurbishment and remodelling to existing warehouse b) proposed addition of first floor office (23sqm) and associated stairs above existing office c) extension to front (west elevation) to include 4no new double glazed windows and 2no roller shutter doors (86sqm). All associated works.
Permission for a strategic housing development consisting of: (i) construction of a Build-To-Rent residential development within a new part six, part eight, part nine, part eleven storey rising to a landmark seventeen storey over basement level apartment building (40,814sq.m) comprising 428 no. apartments (41 no. studio, 285 no. one-bedroom, 94 no. two-bedroom & 8 no. three-bedroom units) of which 413 no. apartments have access to private amenity space, in the form of a balcony or lawn/terrace, an d 15 no. apartments have access to a shared private roof terrace (142sq.m) at ninth floor level; all apartments have access to 2,600sq.m of communal amenity space, spread over a courtyard at first floor level and roof terraces at sixth, eighth and ninth floor levels, a 142sq.m resident’s childcare facility at ground floor level, 392sq.m of resident’s amenities, including concierge/meeting rooms, office/co-working space at ground floor level and a meeting/games room at first floor level, and 696sq.m of resident’s amenities/community infrastructure inclusive of cinema, gym, yoga studio, laundry and café/lounge at ground floor level. The café/lounge will primarily serve the residents of the development and will be open for community use on a weekly/sessional basis; provision of 145 no. vehicular parking spaces (including 8 no. mobility parking spaces, 2 no. club-car spaces and 44 no. electric charging spaces), 5 no. motorcycle parking spaces, bin stores, plant rooms, switch room and 2 no. ESB sub-stations all at ground floor level; provision of bicycle parking (752 no. spaces), plant and storage at basement level; permission is also sought for the removal of the existing vehicular entrance and construction of a replacement vehicular entrance in the north-western corner of the site off Carmanhall Road; provision of improvements to street frontages to adjoining public realm of Carmanhall Road & Blackthorn Road comprising an upgraded pedestrian footpath, new cycling infrastructure, an increased quantum of landscaping and street-planting, new street furniture inclusive of bins, benches and cycle parking facilities and the upgrading of the existing Carmanhall Road & Blackthorn Road junction through provision of a new uncontrolled pedestrian crossing; and, All ancillary works including provision of play equipment, boundary treatments, drainage works - including SuDS drainage, landscaping, lighting, rooftop telecommunications structure and all other associated site services, site infrastructure and site development works. The former Avid Technology International buildings were demolished on foot of Reg. Ref. D16A/0158 which also permitted a part-five rising to eight storey apartment building. The development approved under Reg. Ref. D16A/0158, and a subsequent part-seven rising to nine storey student accommodation development permitted under Reg. Ref. PL06D.303467, will be superseded by the proposed development. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire-Rathdown County Development Plan 2016- 2022 and the Sandyford Urban Framework Plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with the Environmental Impact Assessment Report, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.carmanhallroadshd.ie
Application to An Bord Pleanála for permission for a strategic housing
Development shall consist of 334 Build to Rent Residential Apartment Units within 4 No. apartment blocks and as follows: 79 No. Studio, 175 No. 1 bed, 80 No. 2 bed, All Residential units provided with private balconies/terraces to the north/south/east and west elevations, Creche 272 sqm., Residential amenity spaces 893 sqm. (including a unit of 146.5 sqm. open to the public, resident's gym, business centre, multipurpose room, staff facilities, multimedia/cinema room, shared working space, concierge and games room). Height ranging from 5 to 16 storeys (over basement). Landscaped communal space in the central courtyard. Provision of a new vehicular entrance from Carmanhall Road and egress to Blackthorn Road. Provision of pedestrian and cycle connections. 125 No. Car Parking, 6 No Motor Cycle Parking and 447 cycle spaces at ground floor/under croft and basement car park levels. Plant and telecoms mitigation structures at roof level. The development also includes 2 No. ESB substations, lighting, plant, storage, site drainage works and all ancillary site development works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Development Plan. The application contains a statement indicating why permission should be granted for the proposed development having regard to a consideration specified in Section 37 (2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. Website: https://carmanhallroadshd2022.ie/
The full report covers all 8,702 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D16A/0076/EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report