Permission sought for a first floor extension with hipped roof, to rear, new
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
37, Stillorgan Park, Blackrock, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 9,549 nearby planning records within 5 km where a location match is available.
- Matched source
- D17B/0534
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for development to consist of
The development consists of Retention permission for: 1) The removal of previous pedestrian gate and pillar to front boundary; 2) The existing rear garden room.
Permission for development to consist of the conversion of the existing attic to habitable space and the addition of a new dormer roof window to the rear of the existing part single storey part three storey dwelling house with associated internal alterations.
The provision of a new first floor front and side extension over existing ground floor front and side extension, the provision of two new south facing roof lights, and alterations to the existing roof.
Retention Permission for (a) the extension of a detached home gym (14.5 sq.m.) to the rear (b) alterations to previously approved application D17A/0855 to include extending side extension (1.5 sq.m.) to Eastern boundary wall (c) Reconstruction of sections of the Eastern boundary wall to 2 metres high to the front and 2.4 metres to the rear bounding No. 42 Stillorgan Park.
The full report covers all 9,549 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D17B/0534The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report