Permission for development consisting of a single storey extension to the rear
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
8, Harcourt Villas, Dundrum, Dublin 14
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 13,387 nearby planning records within 5 km where a location match is available.
- Matched source
- D17B/0551
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The erection of new raised balcony (5.5m2 gross area) with glass balustrade & timber screen to upper ground floor level to rear garden, to include existing window enlarged to form new glazed door access to balcony, to rear of existing house (132m2 gross approx) on overall site area 110m2 approx (0.011ha approx)
Retention permission for 5 year temporary planning permission for a pizza container unit and separate storage container unit both with adjoining covered area for outside seating and for collecting service with all associated works
Permission is sought for demolition of existing structure and construction of
Permission to construct a 162sqm. two-storey
Retention Permission is sought for 5 year temporary planning permission for a retail kiosk on the site Ryan's Arbour House, Windy Arbour, Dublin 14. The temporary structure will continue to utilise the front 4 car spaces of the car park and be used as a temporary kiosk to serve mainly tea and coffee to takeaway customers using 16sqm of the car park and a height of 3m for development at this site.
The full report covers all 13,387 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D17B/0551The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report