Permission for modifications to the previously permitted development reg.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Bank Of Ireland, Banking Operations Centre, Old Bray Road, Cabinteely, Dublin 18
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 7,207 nearby planning records within 5 km where a location match is available.
- Matched source
- D18A/0207
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for development consisting of erection of a 2 storey extension
Permission for the demolition of the existing building on site and erection of a part two, part three storey building with the taller element located to the rear, comprising a ground floor retail unit with 3 x 2 bedroom apartments above, internal courtyard, roof terrace, private amenity space provided by balconies, refuse storage, cycle storage and all other ancillary works. A basement is proposed to provide ancillary storage and services to both the retail and residential uses.
Permission for the demolition of the existing building on site and erection of a
3 dwellings
Permission is sought for: the change of use of the retail ground floor and part basement element of the approved development (planning reference D18A/1118) to restaurant use.
The full report covers all 7,207 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D18A/0207The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report