Permission for the development of a new 200 sqm single storey basic
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Rosemount Environmental Research Station, University College Dublin, Belfield, Dublin 4
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 12,977 nearby planning records within 5 km where a location match is available.
- Matched source
- D18A/0527
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the erection of one illuminated free-standing double-sided
Permission for the addition of glass enclosures to each of the 3 no. existing
Permission for illuminated monolith directional signage to be erected at
Planning Permission is sought for extension and alterations to an existing two storey with converted attic 3-bedroom dwelling and single storey standalone office / gym. The extension and alterations to include construction a single storey extension to the side of the dwelling to accommodate alterations to an existing bedroom, a dormer extension at roof level to the rear of the house to accommodate an additional bedroom at roof level, the remodelling of the existing single storey gym/home office to the side of the house to accommodate the extension together with all associated site works all giving a 4-bedroom dwelling with a standalone office / gym.
Permission for provision of dormer window to attic to rere elevation of main
The full report covers all 12,977 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D18A/0527The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report