Permission for the construction of a 120 sqm one-and-a-half-storey pitched
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site to the rear of 43 Barnhill Road, Dalkey, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 5,185 nearby planning records within 5 km where a location match is available.
- Matched source
- D18A/0660
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the construction of a 133.5 sqm one-and-a-half storey
Permission for the construction of a 111 sqm one-and-a-half-storey pitched
Planning permission for the proposed development. The proposed development includes alterations and proposed extension to the existing dwelling. The proposed works comprise A) Enlarging the front door and installing an external insulation system to the front elevation. B) Widening of the existing front gate to provide vehicular access to the site. C) Construction of a part single and part two storey extension (total 94m2) to the rear of the existing property with enclosed external courtyard and providing utility and open plan kitchen living area to ground floor (67m2) and additional bedroom and ensuite at the first floor (27m2) and is to include all ancillary site development and landscaping work.
Permission for single storey porch to front, a two storey
(1) Temporary retention permission for a period
The full report covers all 5,185 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D18A/0660The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report