Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Roseanna, Quayside, 12 Bulloch Harbour, Dalkey, Dublin, A96 RK46

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

14% of nearby decided applications were refused. The preview found 4,879 nearby planning records within 5 km where a location match is available.

Matched source
D18A/0903
Project type
One-off house
Coverage
5 km radius
4,879Nearby applications
14%Refused
4,220Conditional grants
78Refusal reasons

Top refusal reasons nearby

Residential Amenity21
Design14
Visual Amenity11
Other7
Zoning Contravention7

Nearest similar decisions

D18A/0903/E

Permission is sought for the demolition of the existing two storey return to the rere extension: alterations to cottage`s first floor and its roof including raising the ridge height; alterations to cottage`s front elevation and side elevation; part conversion of front garden to hardstanding area with a new vehicular entrance gate to the front garden boundary wall and new side pedestrian gate; provision of dished footpath and all associated site and landscaping works.

Refused0.0 km24 July 2024
D18A/0903

Permission is sought for the demolition of the existing two storey return to the

Granted0.0 km15 November 2018
D17A/1135

Permission is sought for the demolition and clearance of the existing industrial

Refused0.1 km22 February 2018
D22A/0006

Permission for development is sought. The development will consist of the demolition and clearance of the existing industrial single storey warehouses and sheds (1210 sqm) and the development of a mixed-use marine commercial, leisure/community and residential based development. The proposal includes the construction of: A craft boat building workshop / craft boat storage facility, total area 397 sqm, including first floor area of 94 sqm. A single storey building incorporating relocated marine leisure unit (10 sqm), bin store (9 sqm), relocated marine commercial unit (10 sqm) and community water sports changing facility (60 sqm). A three storey building incorporating a cafe (108sqm) at ground floor and one number (411sqm) four bedroom apartment on two levels, at first and second floor, with associated roof terrace at first floor level and two balconies at second floor level, including ground floor entrance and off-street parking (40sqm) for 2 cars. A single storey re-located seafood sales outlet (30sqm) with ancillary bin storage. Four number fisherman's huts, (total area 19 sqm). A new public square fronting on to the harbour (20.85m wide x 9.00m deep =187.65sqm). Three number three storey detached houses (each 412sqm) each with roof terraces and off street covered parking for two cars, with provision for five number visitor car parking spaces. Eight public bicycle parking spaces and four bicycle spaces to serve apartment. Reinstatement and enhancement of existing surface water drainage system in response to best available climate change and wave data, including (i) Recommissioning/reinstatement of existing surface water sump with sluice gate in the eastern part of the land holding; (ii) construction of a new 300mm storm sewer to run from existing sump across the development area of the site to connect to the existing 300mm outfall culvert discharging under the Bullock Harbour quay road; (iii) construction of an additional overflow culvert to run inside the existing development area boundary wall for 46.3m along the eastern and northern edges of the development area; (iv) provision to redirect extreme storm event overflows into a new culvert under the proposed boat storage facility prior to discharge onto quay side (which overflows currently discharge onto the quayside immediately adjacent existing residential property). Stabilisation of the existing development area boundary wall and repair with natural coursed granite stone. A new support wall in concrete will be erected inside section (34.8 m long) of the existing development area boundary wall at rear and north side of site. The existing south-western vehicular access from Bullock Harbour will be maintained and upgraded, creating a two-way roadway and shared footpath affording access to the proposed dwellings to the rear of the development, the development will also include piped infrastructure and ducting; changes in level; site landscaping and all associated site development and excavation works above and below ground. A Natura impact statement will be submitted to the planning authority with the application.

Refused0.1 km02 March 2022
D25A/0099/WEB

The development consists of a new 130sqm part 1, 2 & 3 storey (two storey over lower ground floor) detached 3 bedroom dwellinghouse to the rear garden site of Cuan Beag, Harbour Road, accessed off Ulverton Road, Bullock, Dalkey. The proposal includes the creation of a new vehicular entrance, rear terrace 66sqm, new boundary treatments and all associated ancillary site works.

Granted0.1 km21 January 2026
D22A/0330

Permission is sought for upgrade and extension of existing 3-storey house (a protected structure). a) New carpark deck including new opening in existing front boundary wall and relocation of existing dropped kerb; b) Demolition and reconstruction of existing service wing including new double doors and lowering of existing floor slab; c) Construction of an additional storey within and above the existing parapet including external terrace; d) Removal of chimney at upper level and remodelling of internal partitions; e) New windows and external insulation replicating all period details; f) Reconfiguration of garden paths and lowering of front terrace level; g) Upgrade of foul and surface water drainage systems

Refused0.2 km06 July 2022

The full report covers all 4,879 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required