Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Unit 1 & 2 Dún Laoghaire Industrial Estate, Pottery Road, Dún Laoghaire, Co Dublin A96 A6P2

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 8,415 nearby planning records within 5 km where a location match is available.

Matched source
D18A/0981
Project type
One-off house
Coverage
5 km radius
8,415Nearby applications
13%Refused
7,333Conditional grants
144Refusal reasons

Top refusal reasons nearby

Residential Amenity31
Design27
Visual Amenity24
Other13
Traffic Sightlines12

Nearest similar decisions

D18A/0981

Permission for Change of Use from light industrial to use as Doctor's Surgery

Granted0.0 km11 December 2018
D24A/0775/WEB

We, Renrew T/A Cara Allcare Pharmacy intend to apply for Retention Permission for development at this site Unit 1, Bakers Point, Pottery Road, Dun Laoghaire, Co. Dublin, A96 A6P2. The development consists of the retention change of use from light industrial to pharmacy shop providing additional floor area (37m²) to ground floor pharmacy area and retention change of use from light industrial to doctor’s surgery providing additional floor area (37m²) to ground floor doctor’s surgery area, advertisement signage to south east elevation (10.2m²) in accordance with the lodged plans and documents to include all associated/ancillary works.

Granted0.0 km17 December 2024
D19A/0732

Permission for a) double-sided directional signage on Pottery road at the entrance to Dun Laoghaire Industrial Estate and b) miscellaneous directional / information signage in the undercroft of the Highline Building and in the vicinity of same.

Granted0.0 km30 January 2020
D18A/0980

Permission for: 1. External and internal alterations to the ground floor of the

Granted0.0 km21 January 2019
D19A/0181

Permission for: 1. Construction of a new pedestrian footbridge to Clonkeen

Granted0.1 km17 September 2019
D22A/0226

Permission is sought for alterations to approved development Reg. Ref. D19A/0181 (ABP Ref. 305629). Permission is sought to amend Condition No. 6 of Reg. Ref. D19A/0181 (ABP ref. 305629) to require that the approved cycle and pedestrian bridge to Clonkeen Park be completed within 6 months of occupation of the residential apartments.

Refused0.1 km25 May 2022

The full report covers all 8,415 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required