Permission for attic conversion with 3 dormer type windows, one to the rear
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
26 Stepaside Park, Stepaside, Dublin 18
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 4,930 nearby planning records within 5 km where a location match is available.
- Matched source
- D18B/0451
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning permission is sought for conversion of her attic to storage and a bathroom including 3 no velux windows to the front at roof level
Permission for the construction of a shared pedestrian/ cycle path to connect the existing Cruagh Greenway with Stepaside Park and Enniskerry Road. The development includes all associated site works including landscaping, public lighting, and drainage.
A ground floor single storey lean-to extension to the south west elevation with two roof lights over. A ground floor single storey lean to extension to the side south east elevation. A velux roof window to the front roof profile. Two new first floor windows to the rear elevation.
Permission is sought for rooflights to the front
Proposed new boundary wall to northern boundary of site. New wall to follow gradient of existing site and range in height 2.5 to 2.7m above existing ground levels. Additionally, all ancillary siteworks to facilitate the proposal.
The full report covers all 4,930 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D18B/0451The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report