Permission for: A. The construction of a Digital Media Building (c.7,385 sqm) over 4 storeys comprising restaurant and service yard at ground floor level with computer labs, teaching spaces and social spaces at upper floors and roof level plant with PV panels. B. Works to Goff Avenue, comprising relocated pedestrian crossing. C. The provision of 60 no. bicycle parking spaces a surface level at Goff Avenue (40. no. spaces) and Chestnut Avenue (20. spaces). D. All associated site development, site services, landscaping and boundary treatment works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site of c.0.67ha on former temporary car park located north of the Atrium Building at IADT, Kill Avenue, Dun Laoghaire, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 8,099 nearby planning records within 5 km where a location match is available.
- Matched source
- D19A/0468
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Permission for development. The proposed
90m3 underground fire fighting storage tank at a site of c.0.02 on an existing grassed area (currently a construction site for the DMB Building) located north of the Digital Media Building.
Permission is sought for the installation of
Below ground pumping station with foul tank, associated ancillary items & 2 above ground kiosks serving the Digital Media Building and all existing foul systems on the campus which will be redirected into the tank and pumping station, at an existing surface carpark, located north east of the Atruim building.
Permission is sought for the construction
Source match
Matched from public planning record D19A/0468The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report