Permission for the construction of a new single storey light industrial unit (148sqm) adjoining units 13 and 20.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Churchtown Business Park, Beaumont Avenue, Churchtown, Dublin 14
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 11,482 nearby planning records within 5 km where a location match is available.
- Matched source
- D19A/0574
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Change of use from light industrial to gymnasium.
Permission for development at this site. The development will consist of: demolition of existing single storey rear extension, construction of proposed single storey extension to rear with parapet detail and 1 no. roofight, ridge height raised to accommodate habitable space within attic conversion, hipped roof extended over existing garage, proposed first floor rear extension with flat roof which includes 2 no. rooflights, 2 no. roofights to front of main roof, widening of existing vehicular entrance gate, internal modifications and all ancillary works.
Permission for development. The proposed
Single storey detached 3-bedroom bungalow all at the rear. Site utilises existing existing access gateway between properties 72A and 74 Beaumont Avenue.
Planning permission is sought for a detached 3-bedroom dormer house. Site utilises existing access gateway between properties 72A and 74 from Beaumont Avenue.
The full report covers all 11,482 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D19A/0574The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report