Permission for a) double-sided directional signage on Pottery road at the entrance to Dun Laoghaire Industrial Estate and b) miscellaneous directional / information signage in the undercroft of the Highline Building and in the vicinity of same.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Highline Building, Dun Laoghaire Industrial Estate, Pottery Road, Dun Laoghaire, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 8,419 nearby planning records within 5 km where a location match is available.
- Matched source
- D19A/0732
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for Change of Use from light industrial to use as Doctor's Surgery
We, Renrew T/A Cara Allcare Pharmacy intend to apply for Retention Permission for development at this site Unit 1, Bakers Point, Pottery Road, Dun Laoghaire, Co. Dublin, A96 A6P2. The development consists of the retention change of use from light industrial to pharmacy shop providing additional floor area (37m²) to ground floor pharmacy area and retention change of use from light industrial to doctor’s surgery providing additional floor area (37m²) to ground floor doctor’s surgery area, advertisement signage to south east elevation (10.2m²) in accordance with the lodged plans and documents to include all associated/ancillary works.
Permission for: 1. Construction of a new pedestrian footbridge to Clonkeen
Permission for: 1. External and internal alterations to the ground floor of the
Permission is sought for alterations to approved development Reg. Ref. D19A/0181 (ABP Ref. 305629). Permission is sought to amend Condition No. 6 of Reg. Ref. D19A/0181 (ABP ref. 305629) to require that the approved cycle and pedestrian bridge to Clonkeen Park be completed within 6 months of occupation of the residential apartments.
The full report covers all 8,419 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D19A/0732The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report