Retention permission development. The proposed development shall provide for the retention of 8 echelon car parking spaces serviced by existing vehicular access via St. Louise's Park, Temple Road. The temporary car park will be used as an overflow parking area serving The Alzheimer Society of Ireland, main national office in addition to day care and respite dementia specific services at the location. There are no works proposed to the existing entrance gates along Temple Road (A Protected Structure) or at The Alzheimer Society of Ireland National Office.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
On a site of 0.038 hectare, on lands adjacent to The Alzheimer Society of Ireland's, National Office, Temple Road, Blackrock, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 8,794 nearby planning records within 5 km where a location match is available.
- Matched source
- D19A/0967
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Temporary retention permission for development
Temporary retention permission for development. The proposed development shall provide for a temporary car parking area of 40 spaces serviced by existing vehicular access via St. Louise's Park, Temple Hill and all associated site development works. The temporary car park will continue to be used as an overflow parking area serving Frank Keane Blackrock for a further period of 6 months. There are no works proposed to the existing entrance gates along Temple Hill (A Protected Structure) or the adjacent St. Teresa's House/Centre (A Protected Structure).
Retention Permission for development. The proposed development shall provide
Retention permission is sought for alterations to the front boundary wall.
Retention permission for development. The development consists of the construction of a porch to the front of the property
The full report covers all 8,794 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D19A/0967The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report