Permission for first floor 18m2 side extension
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
43 Dalkey Park, Dalkey, Co. Dublin A96 WF38
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 5,564 nearby planning records within 5 km where a location match is available.
- Matched source
- D19B/0408
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning Permission for attic conversion with hip to gable roof and dormers to front and rear to create main bedroom, bathroom and storage room, roof window to front and rear roof all with associated ancillary works.
Change of use of an existing first floor unit, from residential to sessional childcare/ Montessori school and ancillary facilities.
Permission for widening of existing vehicular entrance and retention
Conversion of his attic to storage and a bathroom including changing the existing hipped end roof changed to a Dutch hipped gable end roof, a Dormer window to the rear at roof level, a window to the new gable wall and a velux rooflight to the front all at roof level.
Planning permission at this site. The development will consist of the demolition of the existing, single storey lean-to shed along the eastern boundary, the construction of a new two-storey extension to the existing first floor flat on the side yard, relocation of ground level access from Dalkey Park and all ancillary internal, site and boundary works above and below ground.
The full report covers all 5,564 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D19B/0408The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report