Retention Permission for development at this site. The development will
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
120, Meadow Park, Churchtown, Dublin 14
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 10,493 nearby planning records within 5 km where a location match is available.
- Matched source
- D19B/0421
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the construction of a two storey extension to the side.
Permission is sought for development which will consist of: 1) Demolition of an existing single-storey extension (7.1 sqm) to the rear of the dwelling; 2) Construction of a new single-storey extension (34.1 sqm) to the front and rear of the existing house(6 sqm + 28.1 sqm = 34.1sqm); 3) Provision of a new dormer window at roof level to the rear elevation(5.5 sqm), facing the rear garden; 4) As exempted development works, the external insulation of the existing house, the installation of solar panels to the front roof slope.
Permission sought for a dormer extension at rear including retention permission for an existing Velux rooflight at side.
Permission for widening existing vehicular access
Two-storey front extension with front-facing gable. Three Velux windows to front roof slope. Single-storey flat roof rear extension. Attic converted for storage with rear dormer and side gable window. Covered side passage extended to front and side. New canopy over front entrance.
The full report covers all 10,493 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D19B/0421The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report