Permission is sought for the demolition of the existing single-storey extension and lowering of existing floor, the construction of a new single-storey extension with attic accommodation, alterations to existing layout and ancillary works at a protected structure.
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
8, Pembroke Cottages, Booterstown, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 10,696 nearby planning records within 5 km where a location match is available.
- Matched source
- D20A/0243
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest planning decisions
Permission is sought for an amendment
Protected Structure; Permission for the refurbishment and extension of the existing dwelling house including the demolition of internal partitions, part of the rear wall of the cottage and existing extensions to rear, installation of 2 new rooflights to rear of existing roof, construction of a single storey extension to the side, 1.5 storey extension to the rear and the creation of a vehicular gateway onto Rosemount Terrace and all associated site works.
Permission for demolition and replacement of existing lean-to with new
Permission sought for development works consisting of: Partial demolition of
Permission for: 1. Demolition of existing shed and existing concrete block
The brief summarizes the pattern across all 10,696 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record D20A/0243The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief