Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

site of c. 0.05 ha, principally located at Block Nos. 7 and 8, Belfield Office Park, Beech Hill Road, Clonskeagh, Dublin 14

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 13,225 nearby planning records within 5 km where a location match is available.

Matched source
D20A/0822
Project type
One-off house
Coverage
5 km radius
13,225Nearby applications
12%Refused
11,603Conditional grants
55Refusal reasons

Top refusal reasons nearby

Residential Amenity15
Visual Amenity13
Design10
Density4
Procedure Invalid4

Nearest similar decisions

D20A/0822

Permission for development on a

Granted0.0 km07 January 2021
D24A/0173

Extension to the existing office building on an overall site of c. 1.99 ha. The proposed development includes for 1) Proposed 2 storey office extension to the east of the existing building with an overall gross floor area of c. 1,562 sq.m. This will result in an increase in office gross floor space from c. 3,179 sq.m to c. 4,806 sq.m. 2) The realignment of the existing internal shared access road and relocation of existing car parking, no additional car parking is proposed. 3) The inclusion of additional EV charging infrastructure, motorcycle parking, cycle parking and cycle parking facilities including a new single storey cycle store (65 sq.m) adjacent to the car park. 4) The removal of an existing prefabricated unit located to the south of the site (c. 238 sq.m). 5) The development will also include for all associated site development infrastructure including landscape areas, tree planting and removal, boundary treatments, sustainable urban drainage systems (SuDS) and features, PV panels (at roof level on proposed extension) and plant at roof level and site lighting.

Granted0.0 km22 August 2024
D19A/0662

Permission for development on a site of c.1.7 ha.The development will consist of

Granted0.1 km30 October 2019
D20A/0350

Permission for development, as permitted under DLRCC

Granted0.1 km17 August 2020
D18A/0657

Permission for the demolition of existing structures and the construction of a

Refused0.1 km30 August 2018
D18A/1099

Permission for: 1. The erection of 1 no. internally illuminated fascia sign with

Granted0.1 km23 January 2019

The full report covers all 13,225 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required