Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Site of c. 0.67ha on former temporary carpark, located north of the Atrium Building, at IADT, Kill Avenue, Dun Laoghaire, Co Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 8,099 nearby planning records within 5 km where a location match is available.

Matched source
D21A/0634
Project type
One-off house
Coverage
5 km radius
8,099Nearby applications
13%Refused
7,072Conditional grants
118Refusal reasons

Top refusal reasons nearby

Residential Amenity29
Design22
Visual Amenity20
Other11
Traffic Sightlines8

Nearest similar decisions

D21A/0634

Permission for development. The proposed

Granted0.0 km19 October 2021
D19A/0468

Permission for: A. The construction of a Digital Media Building (c.7,385 sqm) over 4 storeys comprising restaurant and service yard at ground floor level with computer labs, teaching spaces and social spaces at upper floors and roof level plant with PV panels. B. Works to Goff Avenue, comprising relocated pedestrian crossing. C. The provision of 60 no. bicycle parking spaces a surface level at Goff Avenue (40. no. spaces) and Chestnut Avenue (20. spaces). D. All associated site development, site services, landscaping and boundary treatment works.

Refused0.0 km14 January 2020
D24A/0232

90m3 underground fire fighting storage tank at a site of c.0.02 on an existing grassed area (currently a construction site for the DMB Building) located north of the Digital Media Building.

Granted0.0 km29 May 2024
D21A/0790

Permission is sought for the installation of

Granted0.0 km21 January 2022
D24A/0171

Below ground pumping station with foul tank, associated ancillary items & 2 above ground kiosks serving the Digital Media Building and all existing foul systems on the campus which will be redirected into the tank and pumping station, at an existing surface carpark, located north east of the Atruim building.

Granted0.1 km09 May 2024
D21A/0480

Permission is sought for the construction

Granted0.1 km16 July 2021

The full report covers all 8,099 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required