Full Permission for the indefinite change of use
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Stillorgan Village Centre, Lower Kilmacud Road, Stillorgan, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 9,998 nearby planning records within 5 km where a location match is available.
- Matched source
- D21A/0698
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the replacement of the existing 4-bay, 6.641m long x 1.904m wide
(a) Relocation of permitted ATM (D23A/0334) to the left side of the Lower Kilmacud Road elevation and (b) Change to previously permitted external signage fascia panels (D23A/0334) from 2no. 'Permanent TSB' signs to proposed 3no. 'PTSB' signs.
Change of use of existing retail unit (132.5 m2) to Class 2-Banking Use and amalgamation with existing bank, b) Installation of ATM in in existing bank shopfront. c) Replacement of existing entrance door to retail unit with glazed panels and d) Two new signage panels.
Permission for the demolition of the
Planning permission for development located at a site. The proposed development will comprise the introduction of paid parking at the Stillorgan Village Centre and overflow car park, along with associated ticket machines and signage
The full report covers all 9,998 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D21A/0698The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report