Permission for alterations to the previous grant
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
9 Woodlawn Park, Mounttown, Dun Laoghaire, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 7,297 nearby planning records within 5 km where a location match is available.
- Matched source
- D22A/0119
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for demolition of
Permission sought for the retention and completion
Demolition of ground floor front porch & single storey attached side garage, utility room, shed and boiler room. Construction of single storey rear extension with flat roof over, 2 storey side extension with pitched roof over & 2no. roof lights on rear slope of pitched roof, single storey partial front extension with pitched roof over.
New attic conversion to a home office/storage space measuring 24sqm with a new toilet and velux roof light to the rear along with a new flat roofed dormer roof construction and window to the rear of the new dormer with a window at the top of the new access stairs to the attic along with ancillary site works associated with the proposed development.
Permission for the conversion of the existing attic into a non-habitable storage space to accommodate an attic stairs with dormer window and roof window to the rear along with gable window to the side with all associated ancillary works.
The full report covers all 7,297 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D22A/0119The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report