Permission for development. The development will consist of the removal of the existing iron fence and gate, replacing them with a new 2.1m high vertical bar fence (on top of existing stone wall) and gate, and associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
IAA Beacon, Dalkey Hill, Dalkey, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 5,107 nearby planning records within 5 km where a location match is available.
- Matched source
- D22A/0768
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention permission for changes
Permission for the demolition of existing extensions and pitched roof, construct
Retention permission for alterations to previously approved permission Ref: D12A
The development will consist of: The construction of a single storey, ancillary building for use as a garden room, located to the rear of the existing 3 storey, detached house. Hard and soft landscaping, drainage, an all associated works necessary to facilitate the development.
Permission for: A. Amendments to previously granted planning permission
The full report covers all 5,107 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D22A/0768The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report