Renovation of existing Early years and Family Support Centre, Construction of two storey extension to the rear comprising of welfare facilities at basement, ground and first floor levels. Conversion of existing attic space comprising of modification of existing roof structure, new roof windows to the front, new access stairs from first floor landing, widening of existing vehicular entrance and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Barnardos, 14 Tivoli Terrace South, Dun Laoghaire, Dublin, A96Y008
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 6,999 nearby planning records within 5 km where a location match is available.
- Matched source
- D23A/0671
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention of (i) demolition of two-storey rear extension at lower-ground and ground-floor level (27 sqm) (including an enclosed raised deck to rear at ground-floor level), and construction of a new two-storey rear extension at lower-ground and ground-floor level (70 sqm) with raised deck (10.5 sqm) at ground-floor level, (ii) internal alterations, and (iii) modifications to external steps to front by narrowing stepped access to lower ground-floor level; together with all associated works.
Permission is sought for demolition of an existing two-storey commercial
Permission is sought for revisions to works at
Permission for development.The development will consist of
Permission for development at this site:
The full report covers all 6,999 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D23A/0671The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report