Change of use from light industrial to gymnasium.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 18, Churchtown Business Park, Churchtown Dublin 14, D14PT97
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 11,471 nearby planning records within 5 km where a location match is available.
- Matched source
- D24A/0006
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the construction of a new single storey light industrial unit (148sqm) adjoining units 13 and 20.
Permission for development at this site. The development will consist of: demolition of existing single storey rear extension, construction of proposed single storey extension to rear with parapet detail and 1 no. roofight, ridge height raised to accommodate habitable space within attic conversion, hipped roof extended over existing garage, proposed first floor rear extension with flat roof which includes 2 no. rooflights, 2 no. roofights to front of main roof, widening of existing vehicular entrance gate, internal modifications and all ancillary works.
Permission for development. The proposed
Single storey detached 3-bedroom bungalow all at the rear. Site utilises existing existing access gateway between properties 72A and 74 Beaumont Avenue.
Planning permission is sought for a detached 3-bedroom dormer house. Site utilises existing access gateway between properties 72A and 74 from Beaumont Avenue.
The full report covers all 11,471 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D24A/0006The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report