Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Site within the former Industrial Yarns site (presently Lidl) and the Religious, Dublin Road, Bray, Co. Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

19% of nearby decided applications were refused. The preview found 2,120 nearby planning records within 5 km where a location match is available.

Matched source
D24A/0563/WEB
Project type
One-off house
Coverage
5 km radius
2,120Nearby applications
19%Refused
1,726Conditional grants
2Refusal reasons

Top refusal reasons nearby

Other1
Zoning Contravention1

Nearest similar decisions

D24A/0563/WEB

Permission for development at a site located within the former Industrial Yarns site (presently Lidl) and the Religious Sisters of Charity complex, Dublin Road, Bray, County Dublin. The development will consist of: Revisions and extension of an existing internal road at the former Industrial Yarns site (presently Lidl) to connect the Religious Sisters of Charity complex to the Dublin Road and closure of existing vehicular access at the Dublin Road/Upper Dargle Road Junction; and all associated development works, including revisions to existing footpath/cycle tracks to tie into the proposed extended internal road, provision of footpaths, site clearance, drainage, landscaping and boundary treatment works, road markings, a new entrance gate (c. 2 m height), and all ancillary site works. The application site extends into Wicklow County Council's administrative boundary; thus, a concurrent application is being submitted to Wicklow County Council.

Granted0.0 km13 January 2025
2460455

Revisions and extension of an existing internal road at the former Industrial Yarns site (presently Lidl) to connect the Religious Sisters of Charity complex to the Dublin Road and closure of existing vehicular access at the Dublin Road/Upper Dargle Road Junction and, all associated development works, including revisions to existing footpath/cycle tracks to tie into the proposed extended internal road, provision of footpaths, site clearance, drainage, landscaping and boundary treatment works, road markings, a new entrance gate (c. 2 m height), and all ancillary site works. The application site extends into Dún Laoghaire-Rathdown County Council's administrative boundary; thus, a concurrent application is being submitted to Dún Laoghaire-Rathdown County Council.

Granted0.0 km16 September 2024
D20A/0769

Permission for development. Comprising of

Granted0.1 km14 December 2020
D26A/0006/WEB

Permission for the development will consist of: 1) The extension of the building to the south east to enclose/ internalize the existing canopied travellator, trolley storage areas and associated landing. 2) All ancillary works required to complete to the required Building Regulations standards.

Granted0.1 km27 February 2026
D21A/0654

Permission for development comprising of the

Granted0.1 km02 February 2022
20403

Demolition of 50m2, single storey structure to North East of the site. Change of use of existing first floor from retail / commercial use to residential / apartment use, comprising of 10 new apartment units. Change of use of existing second floor from retail / commercial use to residential / apartment use, comprising of 10 new apartment units. Change of use of existing third floor from retail / commercial use to residential / apartment use, comprising of 8 new apartment units. Construction of 2 new extra floors above existing building, comprising of 7 new apartments per floor totalling 14 apartments. Construction of new 6 storey building as an extension to existing building to the North East corner of the site, comprising of 2 new apartments per floor totalling 12 apartments with new pedestrian entrance to rear of building. Reconfiguration of existing internal and external car parking areas to cater for existing and proposed development. Alterations to existing services to provide connections to proposed apartment units; all together with associated site works, new boundary wall to North East of building, new refuse storage facilities, cycle parking and drainage connections necessary to complete this development;

Refused0.1 km08 February 2021

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required