The development will consist of (1) erection of solar PV panels to the rear (south facing) roof areas of the existing roofscape.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Ronan House, Churchtown Road Upper, Dublin 14, D14AK72
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 12,142 nearby planning records within 5 km where a location match is available.
- Matched source
- D24A/0743/WEB
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for development. The development will consist of
Retention of balcony (including Permission for proposed alterations) to rear of house.
Permission for retention of unauthorised development
The demolition of an existing two-storey detached dwelling (c. 149sqm) and the subsequent construction of a new two-storey over basement detached dwelling (c. 415sqm), set back and widening of existing vehicular entrance and all associated site works.
Planning permission is sought for the demolition of the existing rear single storey extension to the rear, the conversion of the garage to habitable space, the construction of a single storey extension to the front of the existing garage, the construction of a single storey extension to the rear, the widening of the existing entrance gates, internal and external elevational alterations, all at the existing single storey dwelling.
The full report covers all 12,142 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report