Retention Permission for the following works: a) Demolition of rear kitchen extension and side chimney. b) Construction of a flat-roofed, single-storey, ground-floor extension to the rear. c) Provision of roof-lights to the front, side and rear elevations d) Conversion of the roof space into 2no. bedrooms and 2no. en-suite bathrooms. e) Widening of the original front pedestrian entrance to a vehicular entrance. f) All associated site-works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
22 Corrig Park, Dun Laoghaire, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 6,656 nearby planning records within 5 km where a location match is available.
- Matched source
- D24A/0811
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning permission for attic conversion with hip roof to gable and dormer to rear roof to create additional bedroom, ensuite all with associated ancillary works.
Permission for development. The development will consist of a new 1.3m high pedestrian entrance gate and 1.4 m high peris to the existing boundary.
Permission for development. The development
Permission is sought for 1) Demolition and replacement of existing single storey extension to rear comprising dining and living space along with additional works to facilitate this (A Protected Structure).
Permission sought for the construction of a two storey
The full report covers all 6,656 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D24A/0811The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report