The development will consist of: retention of current external signage to Hugo Boss shop unit at Dundrum Town Centre.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Dundrum Town Centre, Sandyford Road, Dundrum, Dublin 16, D16HY94
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 10,805 nearby planning records within 5 km where a location match is available.
- Matched source
- D24A/0841/WEB
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of removal of the covered raised platform oversailing the Millpond wall, reconfiguration / extension of public square hardstanding area and railings, relocation of existing plant to a new plant enclosure at the base of the millpond dam wall, and all associated site and development works. The Millpond is a recorded archaeological monument (RMP: 022-10002).
The development will consist of retention / continuance of use of part of Town Square for food and beverage stalls and concessions and hosting occasional events and promotional activities within a defined area (347sqm), including the associated temporary or moveable structures, seating tables and other temporary works associated with these activities.
Permission for the use of part of the Town Square (Area A - 647 sqm and Area B -
Replacement of 1x advert comprising of 4 x internally illuminated letters on the external entrance of the building. Total size of sign is 3.14 m x 0.71m.
The development will consist of the erection of a temporary suspended platform (200sqm max) over the Millpond to accommodate Santas grotto and ancillary accommodation in a temporary single storey structure on the platform with pedestrian access/ egress from the existing boardwalk on the southern and western sides of the millpond. The temporary structure will be in use for a period not exceeding 8 weeks each Christmas season for a period of 5 years (2025 – 2029 inclusive). The Millpond is a recorded archaeological monument (RMP: 022-10002).
The full report covers all 10,805 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report