Single storey pitched roof bedroom extension to the front, rain canopy over new front door, single storey flat roof TV room/utility extension to rear and pitched roof dormer type light-well roof window to side of existing roof and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
27, Mountain View, Crinken Glen, Shankill, Dublin 18, D18E0V6
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 3,128 nearby planning records within 5 km where a location match is available.
- Matched source
- D24B/0484
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention permission for an existing bathroom roof system
The development will consist of amendments to planning application D23B/0294 which was granted permission on 12/10/2023. The amendments include: 1) changing the roof profile of the rear extension; 2) changing the location of rooflights; 3) moving the south wall of the rear extension; and 4) changing the size of the window to the bathroom.
Permission for development. The development will consist of a single-storey side and rear extension, with new roof lights, to the existing end-of-terrace single-storey dwelling and all associated site works
Permission for a part-single storey, part two-storey side extension to an existing end of terrace single-storey dwelling and all assorted site works.
Permission for development. The development
The full report covers all 3,128 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D24B/0484The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report