The proposed development will consist of the construction of a dormer window in the main roof to the rear of house and a rooflight in the main roof to the front of the house.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
110, Mulvey Park, Dundrum, Dublin 14, D14H793
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 13,135 nearby planning records within 5 km where a location match is available.
- Matched source
- D24B/0495/WEB
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development seeking retention permission consists of the creation of a vehicular access and provision of car parking in the garden to the front of the property. The development seeking permission will consist of narrowing the vehicular access to 3.5m.
Permission for widening of existing vehicular access to the front of the property.
Planning permission is sought for modifications to existing house, new single storey kitchen extension to rear of house, permission also sought for attic conversion with projecting dormer windows to front and rear roof, alterations to existing entrance to be 3.5m in width and all associated site works.
Permission for development.The development will consist of:
Part single-storey and part two-storey flat-roof rear extension: provision of new front vehicular access with dropped kerb, including partial removal of existing boundary wall/railings. and installation of rooflight to the front roof slope at attic level.
The full report covers all 13,135 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report