Planning Permission is sought for provision of 2 rooflights to front of existing detached dormer bungalow.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
5 Glenbower Park,, Churchtown,, Dublin 14.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 12,322 nearby planning records within 5 km where a location match is available.
- Matched source
- D25A/0013
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for demolition of existing detached bungalow and construction
Permission for a single storey extension to rear
Permission for development. The development will consist of; (1) Provision of a new window to the front elevation, (2) Part demolition of existing rear extension and sheds. (3) provision of a new single storey rear extension to the existing house and replacement shed, including alterations to rear and side elevations of the existing house.
The development will consist of reinstating the front door in its original location, changing the existing hip roof to a gable roof to match the opposite gable end, a new rear facing dormer, changes to the existing rear extension to include new glazing and increasing the overall height of the existing flat roof, new rooflights, internal alterations and associated site works.
Permission for development. The development will consist of: Attic conversion for bedroom with dormer window to the rear and Velux roof window to the front.
The full report covers all 12,322 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D25A/0013The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report